9 results

  • BOGIE FRAME AND BOLSTER FATIGUE TEST

    • InnoTrans 2018
    • Hall A, CityCube 401a
    Accredited bogie frame and bolster fatigue test according to EN13749 Special modular test rigs adaptable to customer needs All applications tested High Speed conmuter long distance locomotives freight wagons metro trams special railway cars
    Save
  • Centro de Ensayos y Analisis Cetest, S.L.

    Exhibitor
    Spain
    • InnoTrans 2018
    • Hall A, CityCube 401a
    • Railway Technology Railway Technology
    CETEST is a fully accredited testing and analysis laboratory providing services in the railways sector. We cover the full life cycle of our customers' products offering homologation activities through testing and analysis and consultancy and engineering services to resolve operational problems. We work for a broad range of customers: rolling stock manufacturers, component suppliers, train operators, maintenance providers and infraestructure managers. Our test laboratory is certified to UNE-…
    Save
  • East Japan Railway Company

    Exhibitor
    Japan
    • InnoTrans 2018
    • Hall A, CityCube 307
    • Public Transport Public Transport
    East Japan Railway Company (JR East) is one of the largest passenger railway companies in the world, serving about 17 million passengers daily. We operates conventional lines and high speed rail (shinkansen) covering the east half of mainland Japan, including Tokyo metropolitan area. JR East owns all railway infrastructure and operate and maintain it, as a fully integrated railway company. JR East leverages passenger traffic and railway assets to develop non-transportation businesses. JR East r…
    Save
  • Japan Transport Engineering Company (J-TREC)

    Exhibitor
    Japan
    • InnoTrans 2018
    • Hall A, CityCube 307
    • Public Transport Public Transport
    Japan Transport Engineering Company is a total transport engineering firm manufacturing rolling stock, freight containers, railway tracks and turnouts with its 100% of stocks owned by East Japan Railway Company (JR East), one of the largest passenger railway companies in the world. J-TREC can provide rolling stock as a stand-alone product or total package including maintenance with a full support from JR East. The forerunner of our company is Tokyu Car Corporation which has realized the f…
    Save
  • Jose Angel MARTIN HERNANDEZ

    Contact person of SEGULA Technologies
    Commercial Director RAIL
    • InnoTrans 2018
    • Hall A, CityCube 403
    Save
  • Eva Martinez

    • InnoTrans 2018
    • Hall A, CityCube 401a
    Save
  • OHL-PANTOGRAPH INTERACTION

    • InnoTrans 2018
    • Hall A, CityCube 401a
    The pantogarph is instrumented and calibrated for on-track test according to EN50317, EN 50367 and TSI standards. The following applications can be tested: High speed trains (up to 380 km/h), locomotives, conmuter train, metro, tram, etc.
    Save
  • Ongakukan Co., Ltd.

    Exhibitor
    Japan
    • InnoTrans 2018
    • Hall A, CityCube 307
    ONGAKUKAN Co., Ltd. is engaged in business that supports safety and comfort in the railway industry through production of train simulators for business, exhibition, and training purposes as well as the development of low-cost automated platform doors. We produced our first “Train Simulator” which uses live video footage of a train in operation in 1995. Since then our professional-grade simulators have been being used by railway companies as a training simulator for their drivers. Our most impres…
    Save
  • WHEEL-RAIL CONTACT FORCE MEASURING INSTRUMENTED WHEELSET

    • InnoTrans 2018
    • Hall A, CityCube 401a
    The wheelrail contact plays a key role in the vehicle dynamics from the point of view of aspects as rolling safety, safety against derailment, ride quality, track fatigue, wheel and rail wear, etc. It is because of this that the exact and reliable measurement of vertical and lateral contact forces is very important. Based on a measuring method and algorithm developed by CETEST during years of investigation, CETEST measuring wheelset measures the main contact parameters: the lateral and vert…
    Save